2021-12-06 05:51:48source:
Equipment Configurations:
(1) 1 set of GEO-BC BOREHOLE CAMERA main controller
(2) 1 piece of probe (φ40mm,φ53mm or φ63mm optional)
(3) 1 set of cable winch (0-1500 meters cable,automatic winch)
(4) 1 set of tripod
(5) 1 set of motor wheel hub and depth counter
Inquiry Email: sales@geomative.com
June 8-11, our company will participate in the "4th National Urban Road Subsidence Disaster Prevention Summit Forum and the 3rd Urban Road Underground Disease Body Comprehensive Inspection and Risk Assessment Technology Training Conference" held
In the study of geophysical methods of mineral exploration (alluvial or quartzite), it is an important technical means to use the difference of the charging rate characteristics of metals in the limestone rock and soil layers to judge the location of meta